D 1.4. (October 2007)
This report explains the execution of task 1.4. It presents a set of criteria for selecting the FlOSS projects to measure during task 1.4. In the context of WP1, we find it important to test the limit of our prototype quality models and of the basic metrics, both described in D1.3. This desired is reflected in our selection criteria and in the FlOSS projects selected.
Cf. attachments