Personal tools
You are here: Home About Progress Deliverables (period 1 and 2) D 1.4. (October 2007)
Document Actions

D 1.4. (October 2007)

This report explains the execution of task 1.4. It presents a set of criteria for selecting the FlOSS projects to measure during task 1.4. In the context of WP1, we find it important to test the limit of our prototype quality models and of the basic metrics, both described in D1.3. This desired is reflected in our selection criteria and in the FlOSS projects selected.

Cf. attachments

Related content

Powered by Plone CMS, the Open Source Content Management System

This site conforms to the following standards: